TELECOMMUNICATIONS / SCIENTIFIC FACILITIES
|
Project |
|
Description |
|
Owner |
|
Date |
|
Estimated Construction Cost |
|||||
|
|
|
|
|
|
|
|
|
|
|||||
| HAZUS Ph III, Ph IIIa, and Ph IV | Building Inventory Implementation; Modeling Sensitivity Analysis; Investigation of Estimated vs. Reported Historic Event Consequences | State of Hawaii, Dept. of Civil Defense |
2003 |
||||||||||
|
AT&T Keawaula Cable Terminal Station; Waianae, Oahu, Hawaii Note: Martin & Chock were structural engineers for the design of the original facility as well the recent renovations |
|
- Telecommunications areas, Electronic communications maintenance areas, private dining and food preparation, raised floors - UPS systems - 3-story facility - Facility meets seismic U.B.C. Zone 3 criteria - Reinforced concrete construction - Addition/Renovations performed without any disruption of operations |
|
AT&T Corporation Morristown, New Jersey |
|
1985 original construction1995 (renovation/expansion) |
|
$2 M (not including equipment)$0. 4 M |
|||||
|
|
|
|
|
|
|
|
|
|
|||||
|
Sprint Communications PCS Switching Center; Honolulu, Hawaii |
|
- PCS Switching center facility - Administrative areas, telecommunications support areas, electronic/ communication maintenance areas - UPS systems - Precast prestressed and cast-in-place concrete construction |
|
Sprint Communications |
|
1998 |
|
$4 M |
|||||
|
|
|
|
|
|
|
|
|
|
|||||
|
Operations Support Facility Field Station Kunia; Kunia, Hawaii |
|
- Operations Control Center - Communications Center - SCIF Facility - Classified material spaces - Tempest shielding - UPS for various systems - 3-story facility; 51,000 sq. ft. - Cast-in-place and precast prestressed concrete construction |
|
U.S. Army Corps of Engineers Pacific Ocean Division Fort Shafter, Hawaii |
|
1988 |
|
$11M |
|||||
|
|
|
|
|
|
|
|
|
|
|||||
|
Nasa Infrared Telescope Facility Modernization; Mauna Kea Science Reserve, Hawaii |
|
- Renovations to enhance temperature control - Facility restoration for thermal insulation and dome ventilation and maintenance, wind reinforcing, and new underground exhaust ventilation tunnel - Dome shutter drive repair performance specification - No interruption of operations or viewing schedule |
|
National Aeronautics and Space Administration Washington, D.C. |
|
1994 |
|
$1.5 M |
|||||
|
|
|
|
|
|
|
|
|
|
|||||
|
W.M. Keck Observatory I; Mauna Kea Science Reserve, Hawaii |
|
- World's largest optical telescope - Design of 26,500 sq. ft. observatory building and telescope support pedestal - Incorporates scientific instrumentation vibration criteria - Underground exhaust ventilation tunnel - Performance specification of 56' radius dome including wind, seismic, and icing effects for operational and survival conditions |
|
California Association of Research in Astronomy Pasadena, California |
|
1992 |
|
$6.5 M |
|||||
|
|
|
|
|
|
|
|
|
|
|||||
|
United Kingdom Infrared Telescope (UKIRT) Renovations; Mauna Kea Science Reserve, Hawaii |
|
- Renovations to enhance temperature control - Thermal Upgrade Preliminary Engineering Report - Facility work renovations for exhaust ventilation and HVAC upgrades - Dome ventilation design-build - No interruption of operations or viewing schedule |
|
Joint Astronomy Centre University Park Hilo, Hawaii |
|
1996 |
|
$ 0.5 M (Building only) |
|||||
|
|
|
|
|
|
|
|
|
|
|||||
|
Electronic Communications Maintenance Shop MCBH; Kaneohe, Hawaii |
|
- Electronics communications repair and support facility - Administrative, electronic maintenance areas - UPS for various systems |
|
Dept. of the Navy Pacific Division, Naval Facilities Engineering Command Pearl Harbor, Hawaii |
|
1990 |
|
$2.9 M |
|||||
|
|
|
|
|
|
|
|
|
|
|||||
|
UCLA Knudsen Hall Seismic Evaluation and Renovation University of California; Los Angeles, California |
|
Located in the central UCLA campus, the 152,476 sq. ft. Kudsen Hall is comprised of a 6-story main structure with two basement levels and a 1-story classroom wing with basement. The building house laboratories, laboratory support space, and offices for the Dept. of Physics and Astronomy, as well as classroom space. |
|
University of California Los Angeles, California |
|
1998 |
|
$10 M |
|||||
|
|
|
|
|
|
|
|
|
|
|||||
|
NOAA Laboratory Facility GSA Federal Building; Boulder, Colorado |
|
Structural and civil engineering design services for a 331,000 sq. ft., 2-3 story building to accommodate laboratories and office space. |
|
General Services Administration Denver, Colorado |
|
1994 |
|
$43 M |
|||||
|
|
|
|
|
|
|
|
|
|
|||||
|
UC Berkeley Genetics & Plant Biology Building University of California ; Berkeley, California |
|
This facility consists of two buildings linked by a walkway. One is a 5-story building with 38 laboratories for genetics, molecular biology, and biochemistry; the other is a 2-story classroom building with teaching labs, classrooms, lecture hall, and a cafeteria with indoor and outdoor seating. The structural design consists of reinforced concrete with special vibration design. This facility received R&D Magazine's "Laboratory of the Year" award in its 25th year competition. |
|
University of California at Berkeley |
|
1989 |
|
$39 M |
|||||
|
|
|
|
|
|
|
|
|
|
|||||
|
Climatological/ Atmospheric Research Center; Mauna Loa, Hawaii |
|
Structural engineering design services for an 8,500 sq. ft. research facility on the upper slopes of Mauna Loa |
|
Department of Commerce Boulder, Colorado |
|
1994 |
|
$1.7 M |
|||||
|
|
|
|
|
|
|
|
|
|
|||||
|
MCD Biology Life Sciences Laboratory Complex Addition University of Colorado; Boulder, Colorado |
|
Structural engineers services for a 120,700 sq. ft. laboratory / classroom facility. 40% of the building is underground. 250-seat lecture hall and animal holding facilities. |
|
University of Colorado Dept. of Facilities Management |
|
1994 |
|
$26 M |
|||||
|
|
|
|
|
|
|
|
|
|
|||||
|
Satellite Ground Station |
|
Review of a low-cost proprietary system by Apogee Solutions, Ltd. |
|
|
|
|
|
|
|||||