Our military work has been as a consultant to various architectural and engineering firms. We have successfully completed nearly 100 projects for the Department of Defense in the past 15 years, and we are qualified to provide exceptional service. We have been the structural consultant on four projects receiving the Navy's Pacific Division design awards along with three national, three county and ten private sector design excellence awards.
|
Project |
|
Description |
|
Owner |
|
Date |
|
Estimated Construction Cost |
|
|
|
|
|
|
|
|
|
|
|
Shore Intermediate Maintenance Facility, Submarine Base Pearl Harbor, Hawaii |
|
Alterations and renovations of a single-story reinforced concrete structure. Facility used to service and repair periscopes. |
|
Dept. of the Navy Pacific Division, Naval Facilities Engineering Command Pearl Harbor, Hawaii |
|
1983 |
|
$3 M |
|
|
|
|
|
|
|
|
|
|
|
Submarine Firefighting Trainer Facility (P-021) Ford Island Pearl
Harbor, Hawaii |
|
|
|
Dept. of the Navy Pacific Division, Naval Facilities Engineering Command Pearl Harbor, Hawaii |
|
1991 |
|
$5.5 M |
|
|
|
|
|
|
|
|
|
|
|
Waterfront Brig Pearl Harbor, Hawaii |
|
Development of a 120-Bed Prototype Design |
|
Dept. of the Navy Pacific Division, Naval Facilities Engineering Command Pearl Harbor, Hawaii |
|
1990 |
|
$7 M |
|
|
|
|
|
|
|
|
|
|
|
Avionics Shop NAS Barbers Point Oahu, Hawaii |
|
|
|
Dept. of the Navy Pacific Division, Naval Facilities Engineering Command Pearl Harbor, Hawaii |
|
1985 |
|
$5.5 M |
|
|
|
|
|
|
|
|
|
|
|
Bilge and Oily Waste Collection and Processing Facilities, Phase 1
Pearl Harbor, Hawaii |
|
- Bilge processing facility - Hose Maintenance and storage facility |
|
Dept. of the Navy Naval Facilities Engineering Command Pearl Harbor, Hawaii |
|
1999 |
|
$4.4 M |
|
|
|
|
|
|
|
|
|
|
|
Solomon Islands Parliament Building Honaira,
Guadalcanal |
|
- Recipient of the NAVFAC 1997 Commander's Award for Design Excellence - Metric units |
|
Dept. of the Navy Naval Facilities Engineering Command Pearl Harbor, Hawaii |
|
1993 |
|
$4M |
|
|
|
|
|
|
|
|
|
|
|
Schofield Barracks Existing Quad Buildings Structural Evaluation
Wahiawa, Oahu
|
|
- Structural condition survey of 8 of 29 barracks buildings - Structural evaluation of 2 representative buildings including field testing - Structural strengthening concepts design and costs estimates |
|
U.S. Army Corps of Engineers Fort Shafter, Hawaii |
|
1996 |
|
$80 M |
|
|
|
|
|
|
|
|
|
|
|
Helemano Building 300 BEQ and Dining Facility Modernization Oahu, Hawaii |
|
Renovation and addition of a BEQ and dining facility. The structural scope of work on this project included a seismic evaluation of the facility and incorporation of those findings into a seismic strengthening program. |
|
U.S. Army Corps of Engineers Fort Shafter, Hawaii |
|
1986 |
|
$ 4 M |
|
|
|
|
|
|
|
|
|
|
|
Defense &Accounting Services Regional Finance Center (DFAS)
Building 77 Alterations Ford Island Pearl Harbor, Hawaii |
|
- Alterations to maximize utilization of this existing D.O.D. facility. - Renovations include seismic retrofit - Renovation performed while maintaining operations of staff of 300 - Metric units |
|
Department of the Navy Pacific Division, NAVFACENGCOM Pearl Harbor, Hawaii |
|
1996 |
|
$8.8 M |
|
|
|
|
|
|
|
|
|
|
|
Navy Exchange Distribution Center Pearl Harbor,
Hawaii
|
|
Navy Exchange warehouse facility containing the excess of 170,000 sq. ft. utilizing the invitation for Bid (IFB) and Request for Proposal (RFP) Newport design-build process. |
|
Dept. of the Navy Pacific Division, Naval Facilities Engineering Command Pearl Harbor, Hawaii |
|
1996 |
|
$12.5 M |
|
|
|
|
|
|
|
|
|
|
|
Operations Support Facility Field Station Kunia |
|
- Operations Control Center- Communications Center - SCIF Facility - Classified material spaces - Tempest shielding - UPS for various systems - 3-story facility; 51,000 sq. ft.- Cast-in-place and precast prestressed concrete construction |
|
U.S. Army Corps of Engineers Pacific Ocean Division Fort Shafter, Hawaii |
|
1988 |
|
$11 M |
|
|
|
|
|
|
|
|
|
|
|
Buildings 281, 287, and 278 Renovations Historic Marine Barracks
Conversion Pearl Harbor, Hawaii
|
|
- Preservation Master Planning and structural investigation - Renovate and upgrade 1941 vintage existing marine barracks building for new office occupancy - Major structural repairs and upgrades of two-story, wood-framed buildings |
|
Department of the Navy Pacific Division, NAVFACENGCOM Public Works Center |
|
1996 (Bldg 281)1998 (Bldgs 278, 287) |
|
$ 2.1 M $4.2 M |
|
|
|
|
|
|
|
|
|
|
|
Buildings 1367 & 1368 (BEQs) Renovation and Seismic Retrofit Pearl
Harbor, Hawaii
|
|
Renovation and seismic retrofit of three-story masonry and concrete barracks |
|
Department of the Navy, Naval Facilities Engineering Command, Pacific Division, Pearl Harbor, Hawaii |
|
1998 |
|
$4 M |
|
|
|
|
|
|
|
|
|
|
|
Buildings 452, 489, 490 Repairs and Alterations
Pearl Harbor, Hawaii
|
|
- Structural survey of termite damaged wood-framed warehouse structures of World War II vintage. - Structural repairs of damaged structural elements. |
|
Department of the Navy Pacific Division Public Works Division, Makalapa Pearl Harbor, Hawaii |
|
1992 |
|
$ 0.6M |
|
|
|
|
|
|
|
|
|
|
|
Child Development Center Facility Renovation & Addition Appra
Harbor, Guam
|
|
A child development center comprising a total of 18,000 sq. ft. in four 1-story structures. Structures framed in precast prestressed concrete, masonry and cast-in-place concrete. Design requirements include zone 3 seismic and 155 mph wind loads. |
|
Dept. of the Navy Pacific Division, Naval Facilities Engineering Command Pearl Harbor, Hawaii |
|
1993 |
|
$4 M |
|
|
|
|
|
|
|
|
|
|
|
Navy Housing Project (300 Units) PWC Guam Naval Station, Guam
|
|
This project involved site surveys, topographic surveys, geotechnical analysis, design charrettes involving concept and schematic design, development of cost estimates, and value engineering in preparing Invitation to Bid (IFB) documents utilizing the Request for Proposal (RFP) design-build method. |
|
Dept. of the Navy Pacific Division, Naval Facilities Engineering Command Pearl Harbor, Hawaii |
|
1995 |
|
$45 M |
|
|
|
|
|
|
|
|
|
|
|
Kwajalein Religious and Educational Facility Kwajalein Atoll, Marshall
Islands
|
|
Alterations, renovations and additions to an existing masonry and wood-framed structure. |
|
U.S. Army Corps of Engineers Fort Shafter, Oahu, Hawaii |
|
1995 |
|
$ 2.4 M |
|
|
|
|
|
|
|
|
|
|
|
Kaneohe Marine Corps Air Station Buildings Iwa Damage Repairs Kaneohe, Hawaii |
|
Structural survey and repairs were performed to over 30 buildings and Kaneohe Marine Corps Air Station and Schofield Barracks. |
|
U.S. Navy Pacific Division |
|
1982 |
|
$ 1 M |
|
|
|
|
|
|
|
|
|
|
|
Schofield Barracks Iwa Damage Repairs |
|
Structural survey and repairs were performed to over 30 buildings and Kaneohe Marine Corps Air Station and Schofield Barracks. |
|
U.S. Army Corps of Engineers |
|
1982 |
|
$ 2.5 M |
|
|
|
|
|
|
|
|
|
|
|
Ft. Kamehameha Buildings: Hurricane Iwa Damage Repairs |
|
|
|
U.S. Army Corps of Engineers |
|
1982 |
|
$ 0.1 M |
|
|
|
|
|
|
|
|
|
|
|
BEQs P438 and P439 MCBH Kaneohe, Oahu, Hawaii
|
|
- Participated in the FACD and preparation of RFP design-build documents for two new construction BEQ projects - Project consisted of 640 equivalent spaces - First design-build BEQ project for PACDIV NAVFACENGCOM |
|
Dept. of the Navy Pacific Division NAVFACENGCOM Pearl Harbor, Hawaii |
|
1999 |
|
$34.4 M |
|
|
|
|
|
|
|
|
|
|
|
BEQ 10286 MCBH Kaneohe, Oahu, Hawaii |
|
FACD and preparation of RFP documents for design-build project delivery |
|
Dept. of the Navy, Pacific Division NAVFACENGCOM |
|
1998 |
|
|
|
|
|
|
|
|
|
|
|
|
|
BEQ 286 MCBH Kaneohe, Oahu, Hawaii
|
|
- Participated in the FACD and preparation of RFP design-build documents for this new BEQ project - Project consist of 408 "equivalent spaces" |
|
Dept. of the Navy Pacific Division NAVFACENGCOM Pearl Harbor, Hawaii |
|
2000 |
|
$ 23.7 M |
| Home | Top | Project Experience |
|
|
|
|
|
|||